The test in progress is to be aborted / the test in
progress was aborted.(*)
Parsed from file GE_PARALLELUPS.mib.txt
Company: ge
Module: GE_PARALLELUPS
Vendor: IMV Victron bv
Module: GE_PARALLELUPS
[Automatically extracted from oidview.com]
upsTestAbortTestInProgress_second OBJECT-IDENTITY STATUS current DESCRIPTION "The test in progress is to be aborted / the test in progress was aborted.(*)" ::= { upsWellKnownTests_second 2 }
OID | Name | Sub children | Sub Nodes Total | Description |
---|---|---|---|---|
1.3.6.1.4.1.818.1.1.12.7.7.1 | upsTestNoTestsInitiated_second | 0 | 0 | No tests have been initiated and no test is in progress.(*) |
1.3.6.1.4.1.818.1.1.12.7.7.3 | upsTestGeneralSystemsTest_second | 0 | 0 | The manufacturer's standard test of UPS device systems.(*) |
1.3.6.1.4.1.818.1.1.12.7.7.4 | upsTestQuickBatteryTest_second | 0 | 0 | A test that is sufficient to determine if the battery needs replacement.(*) |
1.3.6.1.4.1.818.1.1.12.7.7.5 | upsTestDeepBatteryCalibration_second | 0 | 0 | The system is placed on battery to a discharge level, set by the manufacturer, sufficient to determine battery replacement and ba… |